ELIN 205 - Field Construction II Credits: 3 This course is designed to teach students to install multiphase high voltage systems and underground multiple cable installation under actual field conditions. Students complete the overhead section that cover structure assembly including grounding, structural guying, conductor installation including stringing and tying, multiphase transformer installation, capacitor installation, regulator installation, and the use of protective coverup material and hot sticks. The underground section covers multiple cable installation, primary and secondary cable termination, threephase pad mount transformer installation and multiphase sectionalizing cabinet installation.